Client Name

Maniba Bhavan

Application

Function Hall

Product

Evaporative Air Cooling System

Location

Ahmedabad

Customer Problem

  • AC cooling was inefficient during peak summer
  • Doors remained open frequently
  • Food smell circulation issue
  • High electricity and maintenance cost

Our Solution

  • Installed industrial air cooling system
  • Fresh airflow with comfortable environment
  • Up to 80% lower power consumption than ACs
  • Lower operational and maintenance cost

Result

Comfortable banquet hall environment even during harsh Gujarat summer conditions.

ENQUIRE NOW